RFQ 18-18: NOTICE OF THE ESTABLISHMENT OF A QUALIFIED CONTRACTORS LIST
Notice is hereby given that the City of Beverly Hills (“CITY”) requests qualified contractors to submit their name and pertinent information to be placed on a list of qualified contractors. This list shall comply with Section 22034 of the California Uniform Public Construction Cost Accounting Act.
Purpose of the List
The purpose of the list is to have a compilation of interested and qualified contractors that the City may use for negotiated or informal bidding as projects arise for one year, with an up to three year extension. Up to seven of the highest ranking contractors will be on the qualified contractors list. The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid. However, any contract awarded will be to the lowest responsive and responsible bidder.
List Categories
Lists will be established for the following areas:
Class “A” General Engineering Contractor
Class “B” General Building contractor
Class “C-5” Framing and Rough Carpentry
Class “C-6” Cabinet, Millwork and Finish Carpentry
Class “C-7” Low Voltage Systems
Class “C-8” Concrete
Class “C-9” Drywall
Class “C-10” Electrical Class
Class “C-11” Elevator
Class “C-12” Earthwork and Paving
Class “C-13” Fencing
Class “C-15” Flooring and Floor Covering
Class “C-16” Fire Protection
Class “C-20” Warm-Air Heating, Ventilating and Air Conditioning
Class “C-23” Ornamental Metal
Class “C-27” Landscaping
Class “C-28” Lock and Security Equipment
Class “C-33” Painting and Decorating
Class “C-35” Lathing and Plastering
Class “C-36” Plumbing
Class “C-39” Roofing
Class “C-43” Sheet Metal
Class “C-45” Signs
Class “C-46” Solar
Class “C-54” Ceramic and Mosaic Tile
Class “C-61” Limited Specialty Classification
Class “D-3” Awnings
Class “D-16” Hardware, Locks and Safes
Class “D-28” Doors, Gates and Activating Devices
Class “D-42” Non-Electrical Sign Installation
Class “D-47” Tennis Court Surfacing
Class “D-50” Suspended Ceilings
Class “D-52” Window Coverings
Class “D-62” Air and Water Balancing
Procedural or substantive questions must be submitted in writing to Karen Domerchie, Project Manager by email to kdomerchie@beverlyhills.org. Completed forms must be submitted via email to Karen Domerchie, deadline to submit information is March 1, 2018 at 5:00pm PST.