Weekly Update 8/28/20

Wilshire/Rodeo Station

Station excavation in progress beneath Wilshire.

The contractor continues excavating the future Rodeo station below the concrete deck panels on Wilshire. This work is expected to last through the first quarter of 2021. Excavation from deck openings and hauling material from the job site may occur from 7 am to 4 pm on weekdays and from 8 am to 6 pm on weekends. Excavation may occur underground 24 hours a day, seven days a week.

South Reeves remains closed at Wilshire.

Over the last few months, the contractor has relocated utilities, installed dewatering wells, installed piles and steel beams, and replaced the street surface on Wilshire between Crescent and El Camino with concrete deck panels. Excavation of the station box will continue below ground over the next several months.

Meanwhile, the contractor continues installing steel beams and concrete deck panels near the future station entrance at South Reeves and Wilshire. The street will remain closed at Wilshire, though access will be provided to the parking garage at 9420 Wilshire.

Geotechnical instrumentation being installed in Beverly Hills.

Geotechnical instruments are being installed within the station box and along the tunnel alignment to monitor ground movement, settlement, and other geological conditions. Upcoming areas include Wilshire between Doheny and La Cienega. This work will include intermittent closures of traffic lanes, sidewalks, crosswalks, and parking meters. Work hours will be weekdays from 7 am to 4 pm on Wilshire.

 

Wilshire/La Cienega Station

Closures anticipated near Wilshire.

The following closures* are scheduled to take place during the upcoming week:

  • North Gale will be closed from 4 am to 6 pm on weekdays and Saturday.
  • Eastbound Wilshire will be intermittently reduced to one lane between Stanley and Gale or between Gale and San Vicente from 9 am to 4 pm and 10 pm to 7 am on weekdays, and from 4 am to 4 pm on Saturday.

Please use alternative routes and continue to respect construction barriers and detours for your safety.

Wilshire lane closures near La Cienega to be removed next weekend.

For the last several weeks, Wilshire has been reduced to two lanes in each direction from Hamilton to San Vicente. K-rail barriers have been in place 24 hours a day. Next weekend, the contractor will remove the K-rail barriers and reopen the traffic lanes.

Lane closures expected on Wilshire and San Vicente.

Beginning August 30, the contractor will perform potholing and grouting work at the intersection of Wilshire and San Vicente. K-rail barriers will be in place 24 hours a day at the intersection through at least October. This work will require closures of traffic lanes on San Vicente and Wilshire, including directional closures on some weekends. Residents are encouraged to contact the project team at purpleline@beverlyhills.org or (310) 285-2467 for more information.

  

Related Projects

Draft Environmental Impact Report for Rodeo Station north portal now available for public comment.

The City of Beverly Hills has prepared a Draft Environmental Impact Report (EIR) for the proposed Rodeo Station North Portal. The purpose of the project is to provide a station entrance/exit for the station on the north side of Wilshire Boulevard to facilitate direct access to businesses and tourist attractions. The Draft EIR evaluates the potential for environmental impacts resulting from three potential portal locations, and provides mitigation measures where required. Click here to review the Draft EIR and Appendices. Click here to see the Notice of Availability.

Public comments will be accepted on this document until 5 pm on Monday, October 5, 2020. Comments must be submitted in writing to the address or email address below by that date. All comments received will be compiled and responded to as part of the Final EIR.

Please submit comments to:

Jessie Holzer, Transportation Planner
City of Beverly Hills Community Development Department
455 North Rexford Drive
Beverly Hills, California, 90210
Email: northportal@beverlyhills.org

 

*Due to the dynamic nature of construction, all dates and times are subject to change.

Current project construction map »

  


The Purple Line Extension will provide a transportation alternative to the congested Westside, including two stops in Beverly Hills: Wilshire/ La Cienega and Wilshire/ Rodeo.

Purple Line Project Map 2019



Sections 1 and 2: La Cienega Station and Rodeo Station Monthly Update Meeting

The City of Beverly Hills cares about your health and safety. We are working closely with the LA County Department of Public Health to monitor the novel coronavirus. To prevent the spread of COVID-19, the City of Beverly Hills has closed City facilities to the public until further notice.  While City offices are closed, the monthly public meetings will be held via live webinar from noon to 1 pm. This meeting will also serve to provide updates normally provided in the monthly evening meeting typically held in-person at Beverly Hills City Hall.

 

When: Wednesdays in 2020: September 2, October 7, November 4, December 2

Time: 12 pm - 1 pm

Where: You may join the webinar from your computer or mobile device by clicking here. To join by phone, call (213) 279-1001 and enter meeting ID 283 641 45 when prompted. Phone participants will not be able to participate in questions and answers during the webinar. Please email purplelineext@metro.net or call (213) 922-6934 with any questions. You should receive a response within 24 hours.

Description: This is a series of monthly meetings for Beverly Hills stakeholders interested in Metro construction for the Wilshire/La Cienega and Wilshire/Rodeo Stations in Beverly Hills.

 

Virtual Special City Council Meeting to Discuss North Portal Draft EIR

A Special City Council Meeting will be held virtually on Wednesday, September 16, 2020 at 7:00 p.m. to discuss the Draft EIR. The meeting will include an overview of the three potential portal locations and a summary of the environmental impacts identified in the Draft EIR. Information on how to access the virtual meeting will be provided at this website: www.beverlyhills.org/citycouncilmeetings  

For questions, please contact the Transportation Planning Division at (310) 285-1128 or transportation@beverlyhills.org.

 

Detailed City Council agendas and meeting videos can be found at http://www.beverlyhills.org/departments/informationtechnology/beverlyhillstelevision/citycouncilmeetings/

Additional information can be found at https://www.metro.net/projects/notices/events_purpleline/

Transportation and Parking: For public transportation, use the Trip Planner at metro.net or call 323.GO.METRO. Two-hour free parking is available at the Civic Center Garage located at 450 N. Rexford Dr.


Links

Metro Presentations: For the latest Metro Presentations, please click this link below and select "Section 1&2: City of Beverly Hills Presentations"


Documents and Presentations

  • MOA Compliance Report
    The Independent Compliance Monitor is required to be on-site for all construction activities to monitor permit conditions and MOA requirements, such as noise compliance, hauling and parking.  Weekly reports are submitted for Section 1 and 2.

  • Contact Log
    The attached logs track contact interactions such as phone conversations, emails and letters for Section 1 (Wilshire/La Cienega) and Section 2 (Wilshire/Rodeo). Metro and the City keep separate contact logs.
  • Claims Process
    As part of the Memorandum of Agreement between the City of Beverly Hills and Metro, Metro is required to maintain an administrative claims process. Residents and businesses may file a claim for damage caused by the contractor during construction of the Purple Line Extension by contacting Metro to complete a field report at purplelineext@metro.net or via telephone at (213) 922-6934.

    You will need to provide the following information: current address, telephone number, date and time of the incident, and a detailed narrative of the incident and any damages incurred. The field report must be completed by a team member of the Metro Purple Line Extension at the email or phone number provided above.

    Please contact Perla Berry with the City of Beverly Hills Project Team at (310) 288-2840 for assistance with submitting a claim to Metro.

    Metro will provide the City with monthly updates on the claims that were filed by residents and businesses.

    Sample Field Report for Reference

BUSINESS RESOURCES

Metro Business Interruption Fund (BIF) information and additional resources for your business: https://www.metro.net/projects/business-interruption-fund/ 


PROJECT DETAILS - Purple Line

The project is scheduled to be built in three sections.  The first section of the Purple Line Extension will extend the subway from the Wilshire/ Western station in Los Angeles to Wilshire/La Cienega in Beverly Hills.  Section 2 extends from the Wilshire/ La Cienega station to the Wilshire/ Rodeo station and then on to the Century City / Constellation station. 

 

 
  • City of Beverly Hills Shield
  • City of Beverly Hills
  • 455 North Rexford Dr
    Beverly Hills, CA 90210
  •  
  • (310) 285-1000
  • Monday-Thursday 7:30AM-5:30PM
  • Friday 8:00AM-5:00PM
© Copyright 2020, City of Beverly Hills. All Rights Reserved.